Here's the rule that catches a lot of people out: you can swap an acrylic shower for a new one in the same spot without building consent, but building a tiled shower in Auckland needs one. Auckland Council's guidance is clear that a tiled wet-area shower is consented work, because it involves building work beyond plumbing: framing, substrate and a waterproofing membrane.
That's why our Full Tile package is four weeks on site and includes consent, which we lodge and manage for you. Here's what that means in practice.
Why a tiled shower is treated differently
An acrylic shower is a factory-made, watertight unit. The plumber connects it, the builder fits it, and the waterproofing is built into the product.
A tiled shower is built on site. The tiles and grout aren't the waterproofing; the membrane underneath them is. If the membrane is applied too thin, misses a corner or isn't lapped into the waste properly, water gets into the framing and you won't see it for years. That's exactly the kind of hidden failure the consent process is there to check. We explain how it should be done in bathroom waterproofing and the Building Code.

What the consent involves
For our Full Tile bathrooms we prepare and lodge the consent before work starts, so the time on site isn't held up waiting for paperwork. A typical consented bathroom goes like this:
- Plans and specification. The layout, the shower construction, the membrane system and the falls to the waste.
- Lodging with Auckland Council. We handle this and answer any requests for information.
- Inspections during the build. Usually before the walls are lined and again when the membrane is down, before tiling covers it.
- Final inspection and Code Compliance Certificate. Once the bathroom is finished, council does a final inspection and issues the CCC. See Code Compliance Certificates, explained.
Inspection times depend on council booking availability, which is one reason we plan the programme around them from day one. Our week-by-week guide shows where each inspection falls.
Is it worth the extra time?
For the right bathroom, yes. A tiled shower gives you things panels and acrylic can't:
- Any size or shape of shower, including a level-entry walk-in with no tray.
- Built-in niches, benches and a linear drain.
- The exact tile you want, from large-format stone-look to terrazzo or a small mosaic.
- A signed-off record of the waterproofing, which matters when you sell.
If you don't need those, a tile-look panel shower gets you most of the look in three weeks with no consent. Compare them in tiles, wall panels or acrylic and our honest review of tile-look panels.
Fixed price · fixed finish date
Indicative starting prices. Your fixed price is confirmed after a short site check.
Not sure which one? Plan it free in 3D or get an instant estimate.
What if my existing tiled shower was never consented?
That's more common than you'd think, especially in houses renovated in the 1990s and 2000s. It can come up on a LIM or a building report when you sell. We cover your options in buying or selling with an unconsented bathroom, and the bigger picture in our guide to bathroom consent in Auckland.
Frequently asked questions
Do I need consent to replace a tiled shower with a new tiled shower?
In Auckland, building a tiled wet-area shower is treated as consented work, even if it's in the same place as the old one. Check with Auckland Council for your situation, or ask us and we'll tell you what your bathroom needs.
Can I avoid consent by using a shower tray and tiling the walls?
Tiled walls around a shower are still a wet area that relies on waterproofing behind the tiles. Rather than looking for a way around it, choose the system that suits the bathroom: a consented tiled shower, or a prefab or panel shower that's designed to be watertight on its own.
Who lodges the consent?
For our Full Tile package, we do. We prepare the drawings and specification, lodge the application, book the inspections and get the Code Compliance Certificate at the end.
Does consent make the renovation take longer?
The paperwork happens before we start, so the on-site time for a Full Tile bathroom is still about four weeks. The extra time is in the planning stage, not with your bathroom out of action.