An unconsented bathroom is bathroom work that needed building consent but was done without it, such as a tiled shower or an added ensuite with nothing on the council file. It's common in NZ, and it doesn't automatically stop a sale, but it can affect price, finance and insurance. The usual ways to resolve it are applying to council for a certificate of acceptance, or redoing the work properly with consent.
This is general information from a builder, not legal advice. If you're in the middle of a sale or purchase, talk to your lawyer and to Auckland Council about your property.
How unconsented work comes to light
The LIM
A Land Information Memorandum (LIM) from council lists, among other things, the consents and Code Compliance Certificates on file for the property. If the house has a tiled ensuite but no consent for it, the LIM won't show one. Council may also note unconsented work it knows about.
The building report
A pre-purchase building inspector looks at the house itself. They'll often flag a bathroom that looks newer than anything on the file, signs of moisture around a shower, or an extra bathroom that doesn't appear on the plans.
Your lawyer may also check council's property file, where a consent with no CCC is another common finding. See Code Compliance Certificates for bathrooms.
First question: did it actually need consent?
Not every renovated bathroom without a consent is unconsented work. Under Schedule 1 of the Building Act, replacing or repositioning fixtures within an existing bathroom is generally exempt, as long as the number of fixtures doesn't go up and a licensed plumber did the plumbing. A new acrylic shower, vanity and toilet in the same places is usually fine. Read like-for-like bathroom renovations.
Work that generally does need consent includes a tiled wet-area shower in Auckland, a new bathroom, extra fixtures, drainage changes and structural work. Our guide to bathroom consent in Auckland sets out the common cases. If you're unsure which side a bathroom falls on, ask Auckland Council.

The options for unconsented work
1. A certificate of acceptance
A certificate of acceptance (COA) is something council can issue for building work that was done without a consent when one was needed. You apply to council, and they assess whether they're satisfied the work complies with the Building Code, as far as they can tell.
Things to know, in general terms:
- Council may need to see inside. With a tiled shower, the membrane is hidden, so council may ask for linings or tiles to be removed, or for other evidence.
- It may be qualified. Council can limit a COA to the parts it was able to check.
- It isn't the same as a CCC. Buyers, banks and insurers may treat it differently, so ask your lawyer how it affects your situation.
- It isn't guaranteed. If council can't be satisfied, the work may need fixing first.
Auckland Council can explain the current process, costs and what they'll need for your property.
2. Redo the work with consent
Sometimes the cleaner answer is to strip the bathroom out and rebuild it properly with consent, ending with a CCC. That makes sense when:
- the shower is leaking or the framing is damaged anyway,
- council would need to remove most of the finishes to assess it, or
- you were planning to renovate the bathroom regardless.
A tiled bathroom rebuilt with consent ends with inspections and a CCC on file. That's what our Full Tile package does: we lodge and manage the consent, the membrane is inspected before tiling, and you get a clear record. See bathroom waterproofing and the Building Code for why that record matters.
3. Leave it, with full disclosure
Some sellers disclose the work and adjust the price, and some buyers accept it. That's a legal and commercial decision with real risks for both sides, including insurance and finance. It's one to make with your lawyer, not your builder.
Fixed price · fixed finish date
Indicative starting prices. Your fixed price is confirmed after a short site check.
Not sure which one? Plan it free in 3D or get an instant estimate.
If you're buying
- Read the LIM and the building report together.
- Ask the seller what was done, when, and by whom, and whether they have invoices or certificates.
- Ask your lawyer about conditions, and check with your insurer and lender.
- If the bathroom will need redoing, get a price before you go unconditional. Our hidden costs guide explains what can turn up behind old showers.
If you're selling
- Order a LIM early so there are no surprises.
- Gather invoices, trade certificates and photos from the renovation.
- Talk to your lawyer and agent about disclosure.
- If you're considering a COA or a rebuild, start early: both depend on council.
Frequently asked questions
Can you sell a house with an unconsented bathroom in NZ?
Yes, it happens, but it can affect price, finance and insurance, and there are disclosure obligations. Talk to your lawyer about your situation before you list or sign.
What is a certificate of acceptance?
It's a certificate council can issue for building work done without a consent that was needed, if council is satisfied the work complies with the Building Code as far as it can assess. It may be limited to what council could inspect.
Will an unconsented bathroom show on the LIM?
The LIM shows consents and CCCs on file, and may note known unconsented work. A bathroom with no consent on file may also be picked up by a building inspector.
Is it cheaper to get a certificate of acceptance or redo the bathroom?
It depends on the bathroom's condition and what council needs to see. Ask Auckland Council about a COA, and ask us to price a consented rebuild so you can compare.