To prepare for a bathroom renovation, clear the room and the path to it, sort parking and access for the trades, make every choice before the start date, and plan where your family will shower. Most of it takes an evening or two, and it makes a real difference to how smoothly the job runs.
Here's the checklist we give people before we start.
1. Empty the bathroom
Take everything out: cabinets, shelves, towels, bath mats, toiletries, the medicine cabinet and anything stored under the vanity. Anything left behind risks getting dusty or damaged during strip-out. If there's something fixed to the wall you want to keep, such as a mirror or towel rail, tell us before the start so we take it off carefully.
2. Clear the path in and out
The old bathroom goes out and new materials come in through your house, so clear a path from the door you'd like us to use. Move rugs, hall tables, pictures and anything breakable. We put down floor protection, but less in the way means less risk.
3. Protect the rooms next door
Dust travels, even with the bathroom sealed off. Close doors to bedrooms and wardrobes nearby, and cover or move things you'd rather keep dust-free. Pictures on the other side of a bathroom wall can shake loose during strip-out, so take them down.

4. Sort access and parking
Trades start early and bring vans and trailers. Make sure there's somewhere close to park, and that we can get to the house without blocking a neighbour. Let us know about gate codes, pets, alarms and where a skip or trailer can sit. In a townhouse or apartment, check body corporate rules first; see townhouse and apartment bathroom renovations.
5. Tell the neighbours
A quick note about the start date and the noisier first days goes a long way, especially in attached homes or on a shared driveway.
6. Finalise your choices
Every decision made before the start date is one that can't hold up the job. Settle the vanity, tapware, toilet and tiles or panels, and check you're happy with the layout. Changing your mind mid-job is the most common cause of delays; read what delays bathroom renovations. Our 3D bathroom designer helps you see it before you commit.
Fixed price · fixed finish date
Indicative starting prices. Your fixed price is confirmed after a short site check.
Not sure which one? Plan it free in 3D or get an instant estimate.
7. Plan for the time without a bathroom
If it's your only bathroom, work out where everyone will shower and what you'll do for a toilet before the first morning. Our packages take about 1 to 4 weeks on site depending on the scope. See renovating your only bathroom for ideas, and how long a bathroom renovation takes for the timings.
8. Plan your days
Water and power will be off for short periods, and the first few days are noisy. If you work from home, plan to be elsewhere for strip-out. Keep pets away from the work area, and make sure children know the bathroom is off limits.
Frequently asked questions
How do I prepare for a bathroom renovation?
Empty the bathroom, clear a path from the door, take down pictures on nearby walls, sort parking for the trades, tell your neighbours, finalise every choice and plan where your family will shower while the work is on.
Do I need to move out during a bathroom renovation?
Usually not. Most people stay at home. Expect dust and noise during strip-out and short water and power shut-offs. If it's your only bathroom, you'll need somewhere else to shower.
Should I take things off the walls in other rooms?
Yes, for walls next to or backing onto the bathroom. Strip-out can shake pictures and mirrors loose, so take them down beforehand.
What should I keep from the old bathroom?
Tell us before the start date if you want to keep anything, such as a mirror, towel rail or cabinet, so we remove it carefully instead of sending it to the skip.