An apartment bathroom renovation in Auckland starts with paperwork, not tools. Before anything is stripped out you'll usually need body corporate approval, agreed working hours and a plan for access and protecting common areas. The building work itself is often simpler than in an older house, but there's less room for error: an upstairs bathroom that leaks doesn't just damage your home, it can damage the unit below.
Here's how townhouse and apartment bathrooms differ, and how we plan them.
Start with your body corporate
If your townhouse or apartment is part of a unit title development, the body corporate rules will say what you can and can't do. Rules vary a lot between buildings, so read yours and ask the body corporate manager before you commit to anything. Common requirements include:
- Written approval before work starts, sometimes with a scope of works or drawings.
- Working hours and noise limits, especially for demolition and tile cutting.
- Lift and common-area protection, and booking the lift for deliveries and rubbish.
- Parking and access for trade vans.
- Rules about plumbing and waterproofing, particularly where pipes or drains are shared.
We're happy to provide the scope and details the body corporate asks for. Leave a few weeks for approval in your plans, because some committees only meet occasionally.
Waterproofing upstairs bathrooms
Most townhouse bathrooms are upstairs, and most apartment bathrooms have someone below them. That changes the stakes.
A factory-made acrylic shower has its waterproofing built in, which is one reason the shorter packages work well in units. A tiled shower relies on a membrane applied on site, and it needs to be done carefully with the right falls to the waste. Auckland Council treats a tiled wet-area shower as consented work, and the membrane is inspected before tiles go on. Read more in bathroom waterproofing and the Building Code.
Floor construction matters too. Many apartments sit on concrete slabs, which are flat but make it hard to move drainage. Timber-framed upper floors in townhouses can flex, which matters for tiles. We check both on the site check.

Townhouses from the 1990s and early 2000s
Some Auckland townhouses built in the 1990s and early 2000s were clad in monolithic plaster systems, and a number of homes from that period had weathertightness problems. That doesn't mean your townhouse has one. It does mean it's worth a careful look at framing and linings around the bathroom when the walls come off, especially near exterior walls and windows.
If your home has been reclad or has a clean building report, that's good news. If you're not sure, we check what we can see before we price the job, and if we find anything unexpected we stop, show you and price it separately. Our hidden costs guide explains how that works.
Which package suits a townhouse or apartment
| If your unit... | Package that often suits |
|---|---|
| Needs a quick, low-disruption update | The Refresh (from $15,000), 1 week |
| Needs a new shower and floor | The Upgrade (from $25,000), 2 weeks |
| Wants a tiled look without a membrane or consent | The Tile-Look (from $29,000), 3 weeks |
| Wants a fully tiled shower and the building allows it | The Full Tile (from $35,000), 4 weeks on site |
Shorter packages also mean fewer days of noise for neighbours and fewer lift bookings, which body corporates appreciate. Tile-look wall panels give a tiled appearance without grout; see our honest review of tile-look panels.
Fixed price · fixed finish date
Indicative starting prices. Your fixed price is confirmed after a short site check.
Not sure which one? Plan it free in 3D or get an instant estimate.
Practical things to plan
- Ensuites. Many townhouses have an ensuite plus a main bathroom, so you can keep one working while we renovate the other. See ensuite renovation costs.
- Ventilation. Internal apartment bathrooms often have no window, so a good extractor fan ducted to outside matters even more.
- Rubbish. Skips may not be allowed on site; we plan removal around the building's rules.
- Neighbours. A short note under the doors before we start goes a long way.
For how other house types compare, see our guide to bathroom renovations across Auckland homes, or read about bungalow and state house bathrooms and villa bathrooms.
Frequently asked questions
Do I need body corporate approval to renovate my apartment bathroom?
Most body corporates require approval for bathroom work, but rules vary between buildings. Check your body corporate rules and ask the manager before you commit.
How much does an apartment bathroom renovation cost in Auckland?
Our packages start from $15,000 for a one-week Refresh up to $35,000 for a fully tiled bathroom. Access, lift bookings and body corporate conditions are covered in the fixed price we confirm after the site check.
Can I have a tiled shower in an upstairs bathroom?
Yes, if the floor is suitable and your body corporate allows it. A tiled shower needs a waterproofing membrane and building consent in Auckland, which we lodge and manage on the Full Tile package.
Should I worry about leaky building issues in my townhouse?
Not automatically. Some 1990s and early 2000s monolithic-clad homes had weathertightness problems, so we look carefully at framing near the bathroom when the walls are open and tell you straight away if anything needs attention.