A good bathroom renovation quote tells you exactly what you're getting, what isn't included, what could change the price and when you pay. If a quote is vague on any of those, that's where the final bill tends to grow.
Here are nine red flags we'd look for if we were reading a quote for our own bathroom, and what a clear quote looks like instead.
9 red flags in a bathroom renovation quote
1. Large provisional sums
A provisional sum is a placeholder for work the renovator can't price yet. A few small ones can be reasonable. But if big parts of the job, like the shower, waterproofing or tiling, are provisional, the quote isn't really a price. Ask what each one covers and how it will be confirmed.
2. No list of exclusions
Every quote leaves something out. The problem is when it doesn't say what. Common gaps include rubbish removal, painting, electrical work, making good around the door and window, consent costs and fittings. If exclusions aren't listed, ask for them in writing.
3. Waterproofing isn't mentioned
In a wet area, the waterproofing membrane is the most important thing you can't see. A quote for a tiled shower should name the waterproofing and who does it. If it's missing, or it's just "tiling", ask. Read more in bathroom waterproofing and the NZ Building Code.
4. A large deposit before anything happens
Payment stages should follow progress on site. A big payment up front, before materials are ordered or work starts, puts the risk on you. Ask how the payments line up with the stages of the job.
5. No programme or finish date
"About a month" isn't a programme. A clear quote tells you how long the job takes on site and when it will be finished. See how long a bathroom renovation takes for realistic timeframes.

6. Nothing about hidden problems
Rot under the old shower, tired wiring and sagging floors are common in older Auckland homes. A good quote explains what happens if something turns up: does work stop, are you shown, is the fix priced before it goes ahead? If the quote is silent, you'll find out on the final invoice. See hidden costs in a bathroom renovation.
7. Silence on consent
In Auckland, a tiled wet-area shower needs building consent, and moving fixtures or adding new ones may too. If your job needs consent and the quote doesn't say who lodges it and who books the inspections, ask. If a renovator says a tiled shower "doesn't need consent", be wary.
8. No written contract
Under the Building Act, residential building work of $30,000 or more (including GST) needs a written contract, and the builder has to give you a prescribed checklist and disclosure statement before you sign. On a job that size, a quote on a single page with no contract is a red flag. On a smaller job, it's still good practice to get the scope and price in writing.
9. A price far below everyone else
If one quote is much lower than the others, it's usually because something has been left out, provisional sums are covering the gap, or the scope is different. Line up the quotes item by item before you assume it's a bargain.
Fixed price · fixed finish date
Indicative starting prices. Your fixed price is confirmed after a short site check.
Not sure which one? Plan it free in 3D or get an instant estimate.
What a clear quote looks like
A quote you can rely on usually has:
- A clear scope, room by room or item by item.
- A fixed price, with any provisional sums small, named and explained.
- A list of what isn't included.
- The waterproofing system and who installs it, for any tiled wet area.
- A programme with a finish date.
- Payment stages tied to progress.
- A plan for hidden problems.
- Who handles consent, if it's needed.
- The renovator's licences, and whether the 10-Year Master Build Guarantee is available on jobs of $30,000 or more.
We build our four packages that way: fixed scope, fixed price after a site check, fixed time on site, and a clear rule that we stop, show you and price any hidden problem before we carry on.
For the bigger picture, read our guide to choosing a bathroom renovator in Auckland, and take our 15 questions to ask a bathroom renovator to each meeting.
Frequently asked questions
What should a bathroom renovation quote include?
A clear scope, a fixed price, any provisional sums explained, a list of exclusions, the waterproofing system, a programme, payment stages, how hidden problems are handled and who manages consent.
What is a provisional sum in a building quote?
It's an allowance for work that can't be priced exactly yet. The final cost may be higher or lower. A few small ones are normal; large ones covering key parts of the job make a quote much less certain.
Is the cheapest bathroom quote the best one?
Not always. A much lower quote often leaves out work or uses provisional sums to keep the headline price down. Compare quotes item by item before deciding.
How much deposit should I pay for a bathroom renovation?
Payment stages should follow progress on site rather than run ahead of it. Ask how each payment lines up with the work, and be cautious about paying a large amount before anything has started.